How to video on how to properly install a berner industrial air curtain and then set the air stream for the most effective air seal.
Berner air curtain door switch installation.
The top of the air curtain has two knockouts on each side of the air curtain allowing for a left hand or right hand power connection.
Connect all supply and control circuit wires according to the wiring diagram provided.
Berner offers an automation control package version of all control packages these allow the air curtain to interact with building automation systems bas or automatic door controllers to turn on or off.
For optimum performance the bottom of the air curtain discharge nozzle should be no more than 1 above the top of the door opening with the air curtain s mounted flush to the wall.
If the air curtain must be mounted higher it must be spaced out from the wall 3 8 for every inch the air curtain is above the door opening.
Maxair air conditioner pdf manual download.
View and download berner maxair installation maintenance instructions manual online.
Consists of a door switch roller plunger or magnetic reed style a time delay and line voltage or 24 volt control.